Showing 250 results

Collections
Industries -- Smelting/Refining Image
Print preview View:

250 results with digital objects Show results with digital objects

D152630-3

Overhead view of trolley assembly at Star Iron & Steel. Trolley No. 1 and No. 2 are being assembled for the Webbers Fall Lock & Dam Crane on February 28, 1969. Photograph ordered by Star Iron & Steel.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970; Hoisting machinery;

D153667-9

A small convoy of trucks prepares to leave Star Iron & Steel, 326 Alexander Ave., loaded with manufactured products on March 13, 1968. Star Iron was well known for its crane production and other heavy duty equipment. Photograph ordered by Star Iron & Steel Co.


Star Iron & Steel Co. (Tacoma); Trucks--Tacoma--1960-1970; Steel industry--Tacoma--1960-1970;

D155703-15

Scenes from the steel industry. By 1969, Star Iron & Steel had been in their Port Industrial location for six years. The larger facility at 326 Alexander Ave. made it possible for the company to increase payroll and accept more jobs. One of the projects in February of 1969 was to build winch components for Everett Alumina Crane. Photograph ordered by Star Iron & Steel.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970; Hoisting machinery;

D155703-18

Scenes from Star Iron & Steel. Star Iron & Steel was one of the northwest's oldest steel fabricating firms. It was well known for the quality of its cranes, especially the heavy duty cranes manufactured for the Navy during WWII. In February of 1969, one of its projects was to manufacture winch components for the Everett Alumina Crane. Photograph ordered by Star Iron & Steel Co.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970; Hoisting machinery;

D157214-58

Scenes from Fick Foundry. Three employees of Fick Foundry, 1005 East D St., are properly wearing safety goggles to prevent eye injuries while they are in the process of pouring molten metal to form castings. Two of the men are tipping a bucket of liquid while using a metal grasping device while the third nudges the molten metal out with a thin rod. Photograph ordered by Winston Fournier & Associates, Dallas.


Fick Foundry Co. (Tacoma); Foundries--Tacoma--1960-1970; Founding--Tacoma--1960-1970;

D138073-6

Architectural office of Star Iron & Steel Co. Men are shown working at desks with architectural plans spread out. One large table in the foreground has an architectural blueprint held down by a book of standards and notepad. Star Iron's new one-story office building was separated from the 100,000 square foot plant to reduce noice level. Star Iron had been in the Tacoma area for decades and was one of the oldest steel fabricating firms in the Pacific Northwest. They built cranes and specialized equipment to handle everything from salmon to missiles. Crane capacities ranged to more than 350 tons. Besides cranes, the company made radio, tv, and power transmission towers, steel for buildings and bridges, and equipment for the lumber industry including log barkers, hydraulic presses, power operated grapples and chip handling buckets. Photograph ordered by Bethlehem Pacific Coast Steel. (TNT 9-1-61, B-10, TNT 7-24-63, A-11)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970; Offices--Tacoma--1960-1970; Blueprints; Books;

A138737-2

Close-up of the bridge end trucks of the 275-ton powerhouse crane built by the Star Iron & Steel Co. of Tacoma for the Barkley Power Plant on Kentucky's Cumberland River. This July 15, 1963 photograph is a cropped view of A-138737-3, and was taken for a government report.


Star Iron & Steel Co. (Tacoma);

A138256-16

Interior of Star Iron & Steel plant. Elevated view on May 1, 1963, of interior of the Star Iron & Steel plant shows fabricated steel products ready to be assembled. Star Iron, well-known for crane construction, also made towers, hydraulic presses, power operated grapples, and fabricated steel for buildings, bridges and grandstands. They had built a larger plant on Alexander Avenue in 1963.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970;

A139500-11

An enormous Brute Crane manufactured by the Star Iron & Steel Co. of Tacoma balances both men on board and heavy loads of plywood in this customer print copied in September, 1963. The presence of other piles of plywood near the building under construction seem to indicate that the Brute Crane has already been put to good use. Photograph ordered by Star Iron & Steel Co.


Star Iron & Steel Co. (Tacoma); Hoisting machinery; Plywood; Building construction;

A142321-5

Crane under construction at Star Iron & Steel Co. The Star Iron & Steel plant was located in new quarters at 326 Alexander Ave. in the Port Industrial area. Custom designing and manufacturing special equipment, cranes, and hoists was its primary business. During July, 1964, gantry cranes weighing 50 and 350 tons were being manufactured by Star Iron & Steel. Gantry cranes were similar to overhead bridge cranes except that the bridge for carrying the trolly or trolleys was rigidly supported on two or more legs running on fixed rails or other runway. Photograph ordered by Star Iron & Steel.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1960-1970; Industrial facilities--Tacoma--1960-1970; Hoisting machinery;

D168437-10

ca. 1900. This is a copy of an early photograph of the Atlas Foundry & Machine Co., originally taken circa 1900. The copy was made in 1978. Atlas Foundry (since renamed Atlas Castings & Technology) was established in 1899 as a manufacturer of iron castings. Steel and brass were later added to its catalog of moldable metals. Its sprawling complex is still located between Center St. and South Tacoma Way.


Atlas Foundry & Machine Co. (Tacoma); Foundries--Tacoma--1900-1910;

D168453-3

Groundbreaking for Atlas Foundry's $5,000,000 expansion and modernization project occurred on February 23, 1978. Standing with his foot on a shovel is company president Leo H. Long, Sr. Among those attending the ceremony were Milo S. Gates and Chuck Fausel (flanking Mr. Long). Founded in 1899, the company is now known as Atlas Castings & Technology. Photograph ordered by Atlas Foundry. (TNT 2-24-78, C-12-article on expansion)


Atlas Foundry & Machine Co. (Tacoma); Foundries--Tacoma--1970-1980; Steel industry--Tacoma--1970-1980; Ground breaking ceremonies--Tacoma--1970-1980; Shovels;

D157751-25

Star Iron & Steel operations. An unidentified Star Iron & Steel Co. employee at work in the company's machine shop in January of 1970. He wears thick safety gloves, sturdy boots and protective outer clothing. He has one hand on the control box and the other on a long piece of metal. Photograph ordered by Star Iron & Steel Co.


Star Iron & Steel Co. (Tacoma); Industrial facilities--Tacoma--1970-1980; Steel industry--Tacoma--1970-1980; Machinery;

D159700-452C

ca. 1971. 1971 Richards color stock footage. A familiar landmark in Tacoma was the imposing smokestack at the ASARCO smelter. It rose over 500 feet at the smelter located near Point Defiance. The smokestack, dubbed the tallest in the world at the time of its 1917 construction, would be demolished on January 17, 1993.


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1970-1980; Smokestacks--Tacoma; Industrial facilities--Tacoma;

D159989-5

Star Iron & Steel operations. A Star Iron & Steel employee in overalls and gloves is shown operating an unidentified machine at the company plant in March of 1971. Star Iron & Steel was a longtime Tacoma firm with origins in the 1920s. Cranes, hoists and special machinery made up 70% of Star Iron & Steel's annual volume. The company also specialized in fabricated steel and aluminum. Photograph ordered by Star Iron & Steel. (TNT 12-13-70, C-21 - article)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1970-1980; Machinery;

D159838-14

Workers are preparing to move a floating bulkhead in early February of 1971 from its construction site at 326 Alexander Ave. to the Port of Tacoma waterfront. It appears that rubber segments are being laid to help with traction. The bulkhead was manufactured by Star Iron & Steel Co. for the U.S. Corps of Engineers. It would be towed by tugboat down the coast and up the Columbia River to a dam on the Snake River. Photograph ordered by Star Iron & Steel Co. (TNT 2-6-71, p. 21- article)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1970-1980; Retaining walls--Tacoma;

D159838-6

A worker makes one final check before the heavy-duty Northwest Hauling Co. truck departs from Star Iron & Steel's tideflats location on February 3, 1971, with a floating bulkhead in tow. After a stop at the Port of Tacoma, the bulkhead would be towed by tug to its final destination at the Little Goose Lock & Dam on the Snake River. Although Star Iron & Steel was perhaps best known for its manufacture of cranes and hoists, it also accepted other contracts; this $165,000 contract was from the U.S. Corps of Engineers. Photograph ordered by Star Iron & Steel Co. (TNT 2-6-71, p. 21- article)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1970-1980; Retaining walls--Tacoma; Trucks--Tacoma--1970-1980;

D23535-7

Atlas Foundry, crane for Broderick & Bascomb, wire rope. Atlas Foundry and Machine Company supplied castings for firms building new machines which kept the company in touch with the general building up of all industries in the area after the war. (T.Times, 8/28/1946, p.5)


Atlas Foundry & Machine Co. (Tacoma); Foundries--Tacoma--1940-1950;

D23535-8

Atlas Foundry, crane for Broderick & Bascomb, wire rope. A crane is being used to set a pole alongside a railroad track. Atlas Foundry and Machine Company was engaged at this time in work for plywood, pulp and paper, railroad and other industries. The company reports work was coming in from all over the west coast. This photograph was used in a newspaper article, Tacoma News Tribune, February 14, 1950, about the poles manufactured by Cascade Pole Company, located on Port of Tacoma Road, that were used for telephone and telegraph poles throughout the world. (T.Times, 8/28/1946, p.5)


Atlas Foundry & Machine Co. (Tacoma); Hoisting machinery; Railroad cars--Tacoma--1940-1950;

A19311-3

Star Iron and Steel Company, interior of plant showing machinery. The information from the upper right corner is: S328 - 1945; Typical Turret Frame Assembly for 50 Ton Capacity Dry Dock Crane, Star Iron & Steel Co., Tacoma, Wash. The Star Iron and Steel Company manufactured heavy cranes and logging machinery. They made some of the largest and heaviest cranes used by the US navy and industry. (T. Times, 2/26/46)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1940-1950;

D36783-6

When the Rainier Steel Corporation began operations at 2201 Lincoln Avenue, on Tacoma's tideflats, in December of 1948 it became Tacoma's only steel plant at that time. Here an unidentified employee of Rainier Steel, in special safety glasses, monitors work being done in the facility. Eugene Cunningham, president and general manager, started the Rainier Steel Corporation because of the acute steel shortage after WWII. Rainier Steel used scrap iron as its raw material and their furnaces melted the iron and produced steel. The company planned to employ fifty people once they reached full operating capacity which was 100 tons daily with the present equipment. The steel was sent to Detroit for use in the automotive industry. (T. Times, 12/13/48, p. 5-article).


Foundries--Tacoma; Founding--Tacoma; Iron & steel workers--Tacoma; Steel; Steel industry--Tacoma; Hoisting machinery; Industrial facilities--Tacoma; Furnaces--Tacoma; Rainier Steel Corp. (Tacoma);

D36783-1

The first steel plant in Tacoma opens on December 3, 1948, at 2201 Lincoln Avenue, on the tideflats. Rainier Steel Corporation's owner, President and General Manager is Eugene Cunningham. View of Phil E. Haglund (left) and Eugene Cunningham standing by the furnace on the first day of operations at Rainier Steel Corporation (T. Times, 12/13/48, p. 5).


Foundries--Tacoma; Founding--Tacoma; Iron & steel workers--Tacoma; Steel; Steel industry--Tacoma; Industrial facilities--Tacoma; Furnaces--Tacoma; Rainier Steel Corp. (Tacoma);

D36783-3

The Rainier Steel Corporation is the first company in Tacoma and in this regional area of its kind. The steel produced is being used to manufacture automobiles, company representatives stated the automobile companies are offering the best prices for their products. View of steel workers watching the first pouring of steel at Rainier Steel Corporation (T. Times, 12/13/48, p. 5).


Foundries--Tacoma; Founding--Tacoma; Iron & steel workers--Tacoma; Steel; Steel industry--Tacoma; Industrial facilities--Tacoma; Furnaces--Tacoma; Rainier Steel Corp. (Tacoma);

D37964-1

Northwest Hauling, view of crane at Tacoma Smelter, Mr. Don Cooney. The crane is seated on a trailer pulled by a large truck cab. It is used to lift trusses and materials to the construction crew at upper levels of the new building at ASARCO.


American Smelting & Refining Co. (Tacoma); Northwest Hauling Co. (Tacoma); Hoisting machinery; Smelters--Tacoma--1940-1950; Building construction--Tacoma--1940-1950;

D33003-14

Publicity shots at Permanente Metals, Bill Gorman. One of Permanente's employees sits at his desk checking lists of figures and order forms. A map of the United States hangs on the wall behind him. Clip boards of additional data also hang on the wall along with schedules. A telephone sits to his right on the desk. The man is wearing a sports jacket, a sweater vest and a tie. He also wears a large ring on his left hand. A pencil protrudes from his jacket pocket. TPL-4555


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Employees--Tacoma--1940-1950; Paperwork; Maps; Telephones;

D33003-2

Publicity shots at Permanente Metals, Bill Gorman. A view of one of the switchboard operators at the Permanente plant in Tacoma and the switchboard panel. She is wearing a headset to enable her to use both hands when operating the cords on the switchboard. A telephone dial is seen beyond her right arm and other office machinery is in the background. The young woman is wearing a two piece suit, a white blouse and a plaid scarf. Permanente acknowledged the high value of each employee in their annual reports. TPL-4555


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Telephone switchboards--Tacoma--1940-1950; Telephone operators--Tacoma--1940-1950; Women--Tacoma--1940-1950;

D42561-2

Crust breaking machine at Permanente, Bill Gorman. A specialized machine has been manufactured to perform the work that had previously been done manually. A crust would form at the openings to the reduction pots where alumina was melted into raw pig aluminum. The plant had two potlines containing 240 reduction pots producing 41 million pounds of alumium per year. (Permanente Metals Corp. 1947-1948 Annual Report)


Permanente Metals Corp. (Tacoma); Aluminum industry--Tacoma--1940-1950; Machinery;

D38272-2

Publicity for Permanente News and Times Industrial Page, Permanente Metals, Bill Gorman. Travis Crowe, one of the storeroom attendants at Permanente Metals Corporation, readies a set of nuts and bolts for use on the aluminum furnaces at the Kaiser aluminum plant on the tideflats. A wall of bins holds all sized nuts and bolts in the storeroom. (T.Times, 2/25/1949, p.49)


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Crowe, Travis; Laborers--Tacoma--1940-1950; Bolts & nuts; Workshops--Tacoma--1940-1950;

D30463-2

Permanente Metals began production at their newly equipped aluminun plant on Taylor Way in Tacoma on October 31, 1947. Permanente purchased the former Olin Corp. facility, built in 1942, from the federal government and spent two years modernizing the plant. The remodeled Tacoma plant was the first in the nation to have self cleaning reduction pots with scrubbing systems, minimizing pollution released into the environment (PMC Annual Report, 1947-1948).


Aluminum industry--Tacoma--1940-1950; Aluminum; Industrial facilities--Tacoma; Laborers--Tacoma; Permanente Metals Corp. (Tacoma)--Employees;

D30266-1

Charles P. Love, General Superintendent of Permanente Metals, along with plant technicians activated the first pot line in Tacoma, making October 31, 1947 the first official day of operations. Other pot lines will be activated, once the plant can make certain everything is operating without problems. The plant is expected to be producing at full capacity by the end of November. View of plant technician checking dials and control system (T. Times, 10/31/47, p. 1).


Aluminum industry--Tacoma--1940-1950; Industrial facilities--Tacoma; Control rooms--Tacoma; Permanente Metals Corp. (Tacoma)--Employees;

Results 1 to 30 of 250