Identity elements
Reference code
Name and location of repository
Level of description
Part
Title
FLEMING-268 Front
Date(s)
- c. 1905 (Creation)
Extent
Content and structure elements
Scope and content
- The cornerstone for the present church was laid in 1903. In 1906, the school was completed. Remodeled in 1961, the cathedral still retains many of the original architectural features. circa 1905.
- Printed on front: Cathedral of Our Lady of Lourdes, Spokane, Washington.