Showing 535 results

Collections
Richards Studio Photographs Boats Image
Advanced search options
Print preview View:

535 results with digital objects Show results with digital objects

D157220-1

Boat launching. Mrs. Robert Sprague of Los Angeles performs the customary duties of ship sponsor as she christens the new all-aluminum ferry, "Avalon," at Martinolich Shipbuilding, on the Port Industrial Waterway, on October 25, 1969. Mrs. Sprague was the wife of one of the ship's owners. The "Avalon" was the largest all-aluminum passenger ferry ever built and would be delivered to Holiday Services in San Pedro, California, two weeks after launching. The ferry, with a 27-foot beam, could carry up to 500 people at once. She would be used to shuttle passengers to Santa Catalina, some 26 miles from Los Angeles. With a maximum speed of 28 knots, the "Avalon" would replace outdated and too expensive steamships. Martinolich built a big new shipshed, with height of 40-feet, to house the ferry while under construction. Photograph ordered by Martinolich Shipbuilding Corp. (TNT 11-20-68, p. 1; TNT 10-12-69, D-12; TNT 10-27-69, p. 6)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries--Tacoma--1960-1970; Sprague, Robert--Family;

D157220-2

Boat launching. The 160-foot all-aluminum ferry, the "Avalon," was successfully launched on October 25, 1969, by Martinolich Shipbuilding from their plant on the Port Industrial Waterway. The sleek vessel had a 27-foot beam and tipped the scale at 182 tons displacement. Four marine gas turbines powered the twin variable-pitch propellors. The "Avalon" was built for Holiday Services for use in shuttling passengers to Santa Catalina, about 26 miles from Los Angeles. She could carry up to 500 passengers with speeds of 25-28 knots. Built for more than $2,000,000, the "Avalon" would be delivered to the San Pedro area about two weeks after its launch date. Mrs. Robert Sprague, wife of one of the ship's owners, had christened the vessel with the traditional bottle of champagne. Photograph ordered by Martinolich Shipbuilding Corp. (TNT 10-12-69, D-12; TNT 10-27-69, p. 6) tnt (A)-052A


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries--Tacoma--1960-1970; Martinolich Shipbuilding Corp. (Tacoma);

D15723-2

ca. 1943. Fishing Fleet. A man waves "so-long" from the deck of a fishing vessel in this circa 1943 photograph. An American flag has been hoisted behind him. The man's name was not provided.


Fishing boats--1940-1950; Flags--United States;

D15723-8

ca. 1943. Fishing Fleet. The "Arctic", "Merit," and "New Oregon" moored side by side circa 1943 at an unidentified location.


Fishing boats--1940-1950; Piers & wharves;

D157435-1

Boat launching. Mary Petrich, daughter of Western Boat Building vice-president James Petrich, christens the new Pearl-Harbor bound YFB-87 ferry on December 18, 1969. The traditional bottle of champagne has exploded upon impact. The YFB-87 ferry was the first vessel launched at Western Boat's new shipbuilding plant on the Hylebos Waterway. Photograph ordered by Western Boat Building Co. (TNT 12-19-69, A-3)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries; Western Boat Building Co. (Tacoma); Petrich, Mary;

D157435-17

Boat launching. The Hawaii-bound ferry, YFB-87, was successfully launched at Western Boat Building's new facilities on the Hylebos Waterway on December 18, 1969. The 165-foot car and passenger ferry had a 38 car/500 passenger capacity. Built for the U.S. Navy, she would be towed to Hawaii in May of 1970, for use traveling to and from Ford Island to Pearl Harbor. Photograph ordered by Western Boat Building Co. (TNT 12-19-69, A-3)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries; Western Boat Building Co. (Tacoma);

D157435-18

The YFB-87, built for the U.S. Navy, was the first vessel launched from Western Boat Building's new shipbuilding plant at 1720 Marine View Dr. N.E. on the Hylebos Waterway. The 165-foot ferry, christened by Mary Petrich, slid down the ways on December 18, 1969. This ferry was not built to operate in Washington waters but instead was towed to Hawaii where she was used for the Pearl Harbor - Ford Island runs. She was completed in May, 1970 and christened "Moko Holo Hele" which means "Ship that goes back and forth". YFB-87 is no longer in service between Pearl Harbor and Ford Island. She went out of service when the Admiral Bernard "Chick" Clarey Bridge opened in April, 1998. (Photograph ordered by Western Boat Building Co.) (TNT 12-19-69, A-3)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries; Western Boat Building Co. (Tacoma);

D157435-2

Boat launching. The YFB-87 is pictured on December 18, 1969, as she slid down the ways at Western Boat Building's new plant at 1720 Marine View Dr. on the Hylebos Waterway. The 165-foot double-ended car and passenger ferry was built for the Navy and would be towed to Hawaii in May of 1970. She was patterned after the Hiyu which now traveled between Point Defiance and Vashon Island. Photograph ordered by Western Boat Building Co.


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Ferries; Western Boat Building Co. (Tacoma);

D157439-10

View of PG-96, the USS Benicia, on launch date of December 20, 1969. The Benicia, the second US Navy ship to bear the name and named after the city of Benicia, California, was launched at Tacoma Boatbuilding's new plant on the Hylebos on December 20, 1969. The 165-foot gunboat had a 24-foot beam and could reach speeds of 40k. She would be commissioned on April 20, 1970 and decommissioned on October 2, 1971. After service in the South Korean navy, the ship was struck from the Naval Register on August 30, 1996, decommissioned and scrapped. Photograph ordered by Tacoma Boatbuilding. (TNT 12-21-69, A-4; www.navsource.org/archives)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma);

D157439-17

Post-launch view of the USS Benicia. The all-aluminum patrol gunboat was successfully launched at Tacoma Boatbuilding's new shipyard on the Hylebos on December 20, 1969. She had been christened by Mrs. W.F. Petrovic, the wife of Puget Sound Naval Shipyard's commander. Tacoma's shipbuilders were very busy during the 1960's with orders from the US Navy as well as from individuals, particularly those seeking big fishing vessels. Both Western Boat Building and Tacoma Boatbuilding would operate from new, larger plants on the Hylebos in 1969. (TNT 12-21-69, A-4)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma);

D157439-4

Boat launching. Saturday, December 20, 1969, saw two major boat launchings in Tacoma. Mrs. W.F. Petrovic, wife of the commander of Puget Sound Naval Shipyard, was the sponsor at the launching of the USS Benicia at Tacoma Boatbuilding's new plant on the Hylebos Waterway. She is standing with her family in pre-launching ceremonies. The 165-foot all-aluminum patrol gunboat was the first to be launched from one of the plant's 350-foot double ways. Photograph ordered by Tacoma Boatbuilding. (TNT 12-21-69, A-4)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Tacoma Boat Building Co., Inc. (Tacoma); Petrovic, W.F.--Family;

D157439-6

Boat launching. With a mighty swing, Mrs. W.F. Petrovic christened the new patrol gunboat, the USS Benicia, at Tacoma Boatbuilding's new $3,000,000 shipyard on the Hylebos Waterway on December 20, 1969. Mrs. Petrovic was the wife of Puget Sound Naval Shipyard's commander. The 165-foot vessel, PG-96, was made entirely of aluminum. The Benicia was the 10th of 12 165-foot gunboats being built for the Navy by Tacoma Boatbuilding. She would be commissioned in April of 1970. Photograph ordered by Tacoma Boatbuilding. (TNT 4-20-69, B-19; TNT 12-21-69, A-4)


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma); Petrovic, W.F.--Family;

D157440-1

Boat launching. An interested crowd watches as the 165-foot tuna seiner, the "John F. Kennedy," slides down the ways into City (now Thea Foss) Waterway on December 20, 1969. Built by the J.M. Martinac Shipbuilding Corp., the ship had a 650-ton frozen fish capacity and would be delivered to Star-Kis Foods on Terminal Island, California. She was a sister ship to the "Mary Antoinette" which had already been delivered to her owners. December 20th also saw the launching of the USS Benicia gunboat by Tacoma Boatbuilding. (TNT 12-21-69, A-4) TPL-9451


Launchings--Tacoma--1960-1970; Boat & ship industry--Tacoma--1960-1970; Fishing boats--Tacoma--1960-1970; J.M. Martinac Shipbuilding Corp. (Tacoma);

D15752-1

ca. 1943. There were about 60 persons aboard the "Gallant Lady II" when she went out in smooth waters in 1943. The vessel is believed to have been constructed by the Tacoma Boat Mart.


Boats--Tacoma--1940-1950;

D15752-2

Group of 60 Tacoma Boat Maintenance workers. The deck is crowded with workers from Tacoma Boat together with their families.


Boats--Tacoma--1940-1950; Tacoma Boat Building Co., Inc. (Tacoma);

D157843-1

Launching. Champagne explodes as Mrs. Joseph A. Gann, wife of the ship's co-owner, officially christens the tuna seiner, "Polaris," on March 7, 1970. The 165-foot fishing boat was one of three ships built for Joseph and Edmund Gann of San Diego by J.M. Martinac Shipbuilding. The sister ship of the "John F. Kennedy" would be handed over to her owners in May and would join the Gann fleet operating near South America and Africa. Photograph ordered by J.M. Martinac Shipbuilding Corp. (TNT 3-8-70, C-23 - article) TPL-9452


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Fishing boats--Tacoma--1970-1980; Gann, Joseph A.--Family; J.M. Martinac Shipbuilding Corp. (Tacoma);

D157843-2

Post-launching. The "Polaris" was successfully launched into Commencement Bay on March 7, 1970, by Mrs. Joseph A. Gann, wife of the ship's co-owner. The Gann family watched as the 165-foot "Polaris" slid down the ways from Martinac Shipbuilding facilities. The "Polaris" had a 650-ton frozen fish capacity and was owned by Joseph and Edmund Gann of San Diego. This would be one of three fishing boats built by Martinac Shipbuilding for the Gann brothers and was expected to be delivered in May. The "Polaris" was destined for fishing operations in South America and Africa. Photograph ordered by J.M. Martinac Shipbuilding Corp. (TNT 3-8-70, C-23- article) TPL-9453


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Fishing boats--Tacoma--1970-1980; J.M. Martinac Shipbuilding Corp. (Tacoma);

D157843-4

Launching party. Posed before the 165-foot tuna seiner, the "Polaris," are members of the launching party on March 7, 1970. The fishing vessel was built for the Gann brothers of San Diego by the J.M. Martinac Shipbuilding Corporation. It was the 9th seiner built of that size by Martinac and one of three built for Joseph and Edmund Gann by the company. Mrs. Joseph A. Gann, clutching the traditional spray of red roses, was the ship's sponsor. Photograph ordered by the J.M. Martinac Shipbuilding Corporation. (TNT 3-8-70, C-23- article) TPL-9454


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Fishing boats--Tacoma--1970-1980; Gann, Joseph A.--Family; Roses--Tacoma; J.M. Martinac Shipbuilding Corp. (Tacoma);

D158000-323C

1970 Richards stock footage. Color photograph of the all-aluminum ferry "Avalon" at Martinolich Shipbuilding facilities on February 9, 1970. The ferry, with capacity of 500 passengers, was launched in October of 1969. At that time she was the largest aluminum vessel (160-feet) built for commercial use according to Martinolich president Anthony Martinolich. The $2,300,000 ship would be put into service in the San Pedro, California, area as a transporter of people to and from Catalina Island. The white and red-trimmed vessel was owned by several owners including Robert Sprague. She came equipped with air ducts, rest rooms, snack bar, cocktail lounge, and fireproof interior. The 27-foot wide vessel also had stabilizers to reduce roll while cruising at sea. The "Avalon" was designed by Phillip Spaulding & Associates of Seattle. (TNT 2-15-70, p. B-8)


Ferries--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Martinolich Shipbuilding Corp. (Tacoma);

D158074-2

Launching. The crowd at Tacoma Boatbuilding's Marine View Dr. facility has just watched the "Grand Rapids" slide gracefully down the ways on April 4, 1970. The ship was the 11th of 12 gunboats built under contract for the US Navy. House Minority Leader and future president Gerald R. Ford and family were on hand for the festivities as the vessel was named after the Fords' home town in Michigan.


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Gunboats--United States; Crowds--Tacoma; Tacoma Boat Building Co., Inc. (Tacoma);

D158074-3

Post-launching. The "Grand Rapids" rests alongside Tacoma Boatbuilding's Marine View Dr. facilities after a successful launching on April 4, 1970. The gunboat was named for the hometown of House Minority Leader Gerald R. Ford; Mr. Ford and his family were in attendance at the launching ceremonies. The PG 98 would be commissioned on September 5, 1970. Photograph ordered by Tacoma Boatbuilding.


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma);

D158402-1

Another view of refrigerated fish barge, previously shown in D158402, image 3. It appears still under construction at the Arcweld plant in Marysville in early May of 1970. Photograph ordered by U.S. Steel Corp., Pittsburgh, PA.


Barges--Marysville; Boat & ship industry--Marysville;

D158402-3

Floating refrigeration facility - fish barge- at Arcweld plant in Marysville, Washington. Barge appears to be placed on a pier. Photograph was taken on May 7, 1970, for U.S. Steel Corp., Pittsburgh, PA.


Barges--Marysville; Boat & ship industry--Marysville;

D158417-19

Launching. View of the "Captain Vincent Gann" prior to her 8 p.m. launching on May 22, 1970. The 191-foot tuna seiner was launched at Tacoma Boatbuilding's Plant #2 in the Port Industrial Yard. This would be the final launching at Plant #2 which had seen the production of nine fishing boats since 1966. All tuna boat construction in the future would be done at Tacoma Boatbuilding's new plant on the Hylebos Waterway. After her launching, the "Captain Vincent Gann" would be transported to the Hylebos location for outfitting and trials. Photograph ordered by Tacoma Boatbuilding. (TNT 5-22-70, D-7- article; TNT 5-24-70, B-11-article) TPL-9458


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Fishing boats--Tacoma--1970-1980; Tacoma Boat Building Co., Inc. (Tacoma);

D158417-22

Launching. People stop and stare at the "Captain Vincent Gann," a 191-foot tuna seiner, on her launch date of May 22, 1970, at Tacoma Boatbuilding's Port Industrial Yard plant. The fishing boat would be the last launching at Tacoma Boatbuilding's Plant #2 as all future tuna boats would be constructed and launched at the new Hylebos Waterway location. She would be launched by Mrs. Edmund Gann, wife of the ship's owner. Delivery was expected to her San Diego-area owners in July. Photograph ordered by Tacoma Boatbuilding. (TNT 5-22-70, D-7 - article; TNT 5-24-70, B-11 - article) TPL-9459


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Fishing boats--Tacoma--1970-1980; Tacoma Boat Building Co., Inc. (Tacoma);

D158441-36C

Tugboats post-christening. On June 13, 1970, two tugboats were christened at Martinac Shipbuilding facilities. Both the "Seneca" (foreground) and "Sioux" (rear) are Seattle-based but will be used to haul barges to Prudhoe Bay in Alaska's oil fields. Color photograph ordered by J.M. Martinac Shipbuilding Corp. (TNT 6-14-70, A-4 - article)


Launchings--Tacoma--1970-1980; Tugboats--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; J.M. Martinac Shipbuilding Corp. (Tacoma);

D158441-5

Oceangoing tugs " Seneca" and "Sioux" were christened at Martinac Shipbuilding facilities on June 13, 1970. View of the "Seneca" in foreground with glimpse of the "Sioux" at left. Both tugs will be based in Seattle but will be utilized in hauling barges to Prudhoe Bay in Alaska. The "Seneca" is already sea-worthy but the "Sioux" still needs outfitting. Photograph ordered by Martinac Shipbuilding Corp. (TNT 6-14-70, A-4)


Launchings--Tacoma--1970-1980; Tugboats--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; J.M. Martinac Shipbuilding Corp. (Tacoma);

D158441-8

Christening of tugboats. Mrs. Edith R. Bullock carries the traditional spray of red roses and a decorated bottle of champagne as she and other principal parties await the christening of the tugboat "Seneca" on June 13, 1970. Another tug, the "Sioux," would also be christened at Martinac Shipbuilding facilities the same day. Both oceangoing vessels were apparently based in Seattle but would haul barges to Alaska's Prudhoe Bay. Standing next to and behind the flowers of the sponsor, Mrs. Bullock, is J.S. Martinac of the shipbuilding firm. Other dignitaries are not identified. Photograph ordered by J.M. Martinac Shipbuilding Corp. (TNT 6-14-70, A-4 article)


Launchings--Tacoma--1970-1980; Tugboats--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; J.M. Martinac Shipbuilding Corp. (Tacoma); Bullock, Edith R.; Martinac, J.S.;

D158443-3

Launching party. Posed before the patron gunboat PG-100 (formerly PGM-100) are the dignitaries involved in the launching ceremony on June 19, 1970. Clutching the traditional bouquet of beribboned red roses is Mrs. Willard F. Searle, Jr., of Alexandria, Virginia, the ship's sponsor who had the honor of christening the ship with a bottle of champagne. The "USS Douglas" was named after the city of Douglas, Arizona. Also in the photograph is believed to be Rear Adm. W.F. Petrovic, commander of the Puget Sound Naval Station. The gunboat was built by Tacoma Boatbuilding Co., the last in a series of 12 aluminum gunboats built for the US Navy by that firm. Photograph ordered by Tacoma Boatbuilding Co. (TNT 6-19-70, p. 7- article)


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma); Searle, Willard F.--Family; Roses--Tacoma;

D158443-7

Launching. The Tacoma Class Gunboat PG-100 (formerly PGM-100) was launched in ceremonies occurring at Tacoma Boatbuilding Co. at 4:45 p.m. on June 19, 1970. She would be commissioned the "USS Douglas" in February of 1971. The gunboat had a displacement of 250-ton and was 165-feet in length. She had a speed of 40k and was equipped with two gun mounts and two twin .50-cal machine guns. Only 6 1/2 years after she was commissioned, she was decommissioned and struck from the Naval Register. The "Douglas" was converted to a research vessel and renamed the R/V "Lauren." Photograph ordered by Tacoma Boatbuilding Co. (www.navsource.org/achives; TNT 6-19-70, p. 7 - article)


Launchings--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Gunboats--United States; Tacoma Boat Building Co., Inc. (Tacoma);

Results 121 to 150 of 535