- 2.6.2-020602_9_CanoeDesign_No05
- Item
Technical drawing, Planking Diagram. Drawn by E.C. Willits.
Technical drawing, Planking Diagram. Drawn by E.C. Willits.
Technical drawing, Garstreak. Drawn by E.C. Willits.
Technical drawing, Outside Stem. Drawn by E.C. Willits.
Technical drawing, Body Plan, Outside of Canoe. Drawn by E.C. Willits.
Technical drawing, Coaming. Drawn by E.C. Willits.
Technical drawing 43-A, Deck Brace #2. Drawn by E.C. Willits.
Technical drawing 27-A, Stern Seat Assembly. Drawn by E.C. Willits.
Technical drawing 17-A, Thwart Plate. Drawn by E.C. Willits.
Technical drawing 5-A, Follower Streaks. Drawn by E.C. Willits.
Technical drawing 3-C, Lines, Body Plan. Drawn by E.C. Willits.
Technical drawing 41-B, Deck, Flat Projection of Bracing. Drawn by E.C. Willits.
Technical drawing 12-B, Triangle Piece. Drawn by E.C. Willits.
Technical drawing 49-B, Coaming. Drawn by E.C. Willits.
Technical drawing 42-B, Deck Brace #1. Drawn by E.C. Willits.
Technical drawing 18-A, Bow Seat Assembly. Drawn by E.C. Willits.
Technical drawing 14-A, Thwart Bar. Drawn by E.C. Willits.
Technical drawing 4-A, Garstreak. Drawn by E.C. Willits.
Canoe Components Timed Manufacturing Processes
Includes records providing an account of time required to accomplish manufacturing steps for components and finished canoes.
Includes manufacturing record, list of stolen canoes, and other manufacturing and sales information.
Diary of Willits Brothers May 25, 1911 - August 3, 1914
Diary of Willits Brothers January 1, 1910 - May 2, 1911
Includes diary canoe design and construction activities of Willits Brothers Boat Builders, 3719 North Washington Ave Tacoma WA, Earl C. Willits, Floyd C. Willits.
Men and Boys at Camp Ta-ha-do-Wa with Willits Canoes August 3, 1956
Includes photo of men and boys in Willits Canoes at Camp Ta-ha-do-Wa August 03, 1956.