Industries -- Smelting/Refining Image With digital objects
Print preview View:

D31684-9

Permanente. The white, powdery alumina was discharged from bins into electrolytic cells known as reduction pots where it was periodically stirred. After heating in the reduction pots the molten aluminum was siphoned from the pots into 1 1/2 ton ladles. The ladles would be transferred by crane to the end of the potroom buildings where the molten metal was poured into molds forming pigs weighing 50 to 1,000 pounds. (Permanente Metals Corporation 1947-1948 Annual Report) TPL-4541


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Aluminum; Laborers--Tacoma--1940-1950; Founding--Tacoma--1940-1950; Foundries--Tacoma--1940-1950;

D31684-3

Permanente. An employee of Permanente at the Tacoma plant looks very grateful for the medical assistance received from a nurse in the medical unit. He is now wearing a large, gauze bandage on his thumb. In 1947-1948 Permanente reported having nearly 5,000 employees in their several locations in Baton Rouge, Louisiana; Owens Lake, Natividad, Oakland, and Moss Landing, California; and Mead, Trentwood and Tacoma, Washington. (Permanente Metals Corporation Annual Report 1947-1948)


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Infirmaries--Tacoma--1940-1950; Nurses--Tacoma--1940-1950; Wounds & injuries--Tacoma; Accidents--Tacoma;

A31756-1

Crane in shop for Times annual edition, Star Iron & Steel, Mr. Anderson. Star Iron and Steel had just completed this Gantry crane for the Bureau of Reclamation. It had a capacity of 13 1/2 tons and a total lift of 222 feet. The crane was to be used to handle the bulkhead gates at the Marshall Ford Dam, Colorado River Project, Texas. A similar crane, with 325 ton capacity, was being built at this time for the Davis Dam on the Colorado River. (T.Times, 2/26/1948, p.32)


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1940-1950; Hoisting machinery; Factories--Tacoma--1940-1950;

D29327-2

Shiploading aluminum ingots at Shaffer Terminal #3, Permanente Metals, Pat Love. An artistic shot of shiploading at Shaffer Terminals, Inc. The men are loading aluminum from Permanente Metals Corporation through the hatch of an Argentine government freighter, the Palamar. (T.Times, 8/28/1947, p.1)


Permanente Metals Corp. (Tacoma); Aluminum industry--Tacoma--1940-1950; Shipping--Tacoma--1940-1950; Shaffer Terminals, Inc. (Tacoma); Loading docks--Tacoma--1940-1950; Cargo ships--Argentina; Hoisting machinery;

D29327-3

Shiploading aluminum ingots at Shaffer Terminal #3, Permanente Metals, Pat Love. An artistic shot of shiploading at Shaffer Terminals, Inc. Aluminum from Permanente Metals Corporation is being loaded through the hatch of an Argentine government freighter, the Palamar. The aluminum was produced at Permanente Metals Corp.'s Spokane reduction plant. It was hauled across the state by rail and delivered to Shaffer Terminals. (T.Times, 8/28/1947, p.1)


Permanente Metals Corp. (Tacoma); Aluminum industry--Tacoma--1940-1950; Shipping--Tacoma--1940-1950; Shaffer Terminals, Inc. (Tacoma); Loading docks--Tacoma--1940-1950; Cargo ships--Argentina; Hoisting machinery;

D30463-4

The Pacific Northwest offered Permanente Metals, the producers of Kaiser aluminum, inexpensive hydro-electric power. In order to produce one pound of aluminum approximately 10 kilowatts of electricity is needed, therefore the Northwest is the ideal location for the Tacoma and Mead, near Spokane, plants. Interior view of the pot room, the white powdery substance is alumina, which is discharged into the reduction pots, the molten aluminum is siphoned from the pots into one and a half ton ladles (PMC Annual Report, 1947-1948).


Aluminum industry--Tacoma--1940-1950; Aluminum; Industrial facilities--Tacoma; Laborers--Tacoma; Permanente Metals Corp. (Tacoma)--Employees;

D30266-5

Permanente Metals took over the Olin Aluminum facilities, that had shut down in November 1945, these facilities had not been in use until now. Kaiser bought the plant from the United States War Assets Administration, they then invested over one million dollars to modernize the plant. The Tacoma plant featured many self cleaning machines and a knowledgeable staff (T. Times, 10/31/47, p. 1).


Aluminum industry--Tacoma--1940-1950; Industrial facilities--Tacoma; Control rooms--Tacoma; Permanente Metals Corp. (Tacoma)--Employees;

D30266-13

View of new pot line at the Tacoma reduction plant of the Permanente Metals Corp. It is the first reduction plant in the world to be thoroughly equipped with a scrubber system. This equipment is able to automatically wash away the fumes that are given off in the reduction process. The system consists of individual collectors connected to each pot and several washing stations. Permanente staff can be seen in the center area of the reduction plant.


Aluminum industry--Tacoma--1940-1950; Industrial facilities--Tacoma; Equipment; Machinery; Control rooms--Tacoma; Permanente Metals Corp. (Tacoma);

D33003-3

Publicity shots at Permanente Metals, Bill Gorman. Two workmen from the Permanente plant shake hands. One of the men is older, wearing coveralls, a stripped shirt and a hat. The other man is younger wearing a plaid shirt, work pants and a hat. They look at each other and smile. It looks like they already like each other and will work well together. The plant facilities are seen in the background. TPL-4555


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Laborers--Tacoma--1940-1950; Employees--Tacoma--1940-1950;

D38272-7

There's nothing wrong with this chest, it's been x-rayed says Dave Schrader to Bill Courtney, employees at Permanente Metals Corp. As part of a U.S. Public Health Service campaign, all the employees at the Kaiser Aluminum plant in Tacoma received chest x-rays in 1949. In February of 1949, Permanente employed over 3,600 men in their three Washington plants with a combined payroll exceeding $12 million. (Publicity for Permanente News, and Times Industrial Page, Permanente Metals, Bill Gorman) (T.Times, 2/25/1949, p.37) TPL-3686


Permanente Metals Corp. (Tacoma)--Employees; Schrader, David A.; Courtney, William E.; Radiography; Health care--Tacoma--1940-1950;

D42561-7

Crust breaking machine at Permanente, Bill Gorman. Workmen are using a new machine to break the crust that developed on the molten aluminum in the reduction pots at the Permanente aluminum plant. This had been a manual process before development of the specialized machine.


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Laborers--Tacoma--1940-1950; Machinery;

D35733-11

Permanente's First Anniversary, Permanente Metals, Bill Gorman. A family enjoys hot dogs during the celebration at Permanente on October 27, 1948. The older girl sits on a stack of aluminum pigs that have been produced at the plant. The woman holds a baby with one arm and her hot dog in her other hand. The weiners for the event were fried on one of the hot 500 pound pigs of aluminum at the plant. (T.Times, 10/28/1948, p.1)


Permanente Metals Corp. (Tacoma)--Employees; Aluminum industry--Tacoma--1940-1950; Laborers--Tacoma--1940-1950; Families--Tacoma--1940-1950; Frankfurters--Tacoma--1940-1950;

A43617-1

Interior showing smelter job in foreground, Star Iron & Steel Co., Bob Allen. Welders are at work manufacturing parts for the Tacoma smelter, American Smelting & Refining Company.


Star Iron & Steel Co. (Tacoma); Steel industry--Tacoma--1940-1950; Factories--Tacoma--1940-1950; Welding--Tacoma--1940-1950; American Smelting & Refining Co. (Tacoma);

D36783-2

Rainier Steel Corporation was incorporated in July 1948, the first steel was poured on December 3, 1948; the incorporated value of the plant is $200,000. The plant is only operating at 50%, at this time, the full capacity of the plant will be 100 tons per day. This Tacoma industry is helping fill the demands of the national steel shortage, most of the steel produced in Tacoma is being sold to automobile companies in Detroit, Michigan. View of unidentified steel worker checking the controls on the equipment (T. Times, 12/13/48, p. 5).


Foundries--Tacoma; Founding--Tacoma; Iron & steel workers--Tacoma; Steel; Steel industry--Tacoma; Industrial facilities--Tacoma; Rainier Steel Corp. (Tacoma);

D46292-1

Interior at plant, Permanente Metals, Ted Schmidt. Interior view of the pot room, laborers are pouring the molten aluminum into a mold to form pigs. Pigs will weigh between fifty and one thousand pounds. The pigs are cooled, stacked on pallets and transported to the rolling mill at Trentwood, located near Spokane, Washington. The pigs from the Mead and Tacoma plant are later re-melted in furnaces where other metallic elements are added to form standard alloys (PMC Annual Report, 1947-1948).


Aluminum industry--Tacoma--1940-1950; Aluminum; Industrial facilities--Tacoma; Laborers--Tacoma; Permanente Metals Corp. (Tacoma)--Employees;

D49184-19

Ten unidentified employees of ASARCO who attended the first meeting of the Tacoma Smelter's 25 Year Club held at the Towers, 6805 6th Ave. on April 10, 1950. The club originated with 185-207 members, all active or retired employees of the Smelter with 25 or more years of service with the company. The chairmanship was passed down at the first meeting from Earl Marble, the manager of the plant who was instrumental in setting up the group, to retired plant manager Eugene A. White..


Tacoma Smelter (Tacoma);

D65651-6

The Tacoma Smelter, American Smelter and Refining Company (ASARCO), held a dinner party for their "Old Timers" in April of 1952. View of six men and one woman at banquet table.


American Smelting & Refining Co. (Tacoma)--Employees; Banquets--Tacoma--1950-1960;

A53673-6

Dust collecting equipment at Tacoma Smelter. During 1950 the American Smelting and Refining Company added a new sulphuric acid recovery plant. Other improvements during the year included modernization of the arsenic plant and installation of new ore-handling facilities to increase capacity to 200 tons an hour, replacing facilities which had been installed before they took over the Tacoma plant in 1905. Ordered by American Air Filter Company, c/o R.E. Chase & Company, Mr. Warren.


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1940-1950; Copper industry--Tacoma--1940-1950; Industrial facilities--Tacoma;

A59779-1

The interior of the new pre-fab plant of Bethlehem Pacific Coast Steel Corporation at 8501 East Marginal Way, Seattle. Ordered by Mr. Morse.


Bethlehem Pacific Coast Steel Corp. (Seattle); Factories--Seattle;

A59779-11

The exterior of the new pre-fab plant of Bethlehem Pacific Coast Steel Corporation. Ordered by Mr. Morse.


Bethlehem Pacific Coast Steel Corp. (Seattle); Factories--Seattle;

D61317-1

Two employees of Bethlehem Pacific Coast Steel's Seattle plant are shown at work on September 26, 1951. One man grips a piece of steel with his gloved hand while the other worker seems to be in the process of riveting. According to the 1951 Seattle City Directory, Bethlehem Pacific Coast Steel had several facilities in the Seattle area including a Rolling Mill and office at 4001 28th Ave. S.W., a Bolt and Nut dept. at 3800 Iowa Ave., a Tank Farm at 3301 26th Ave. S.W., and a Mill Depot at 3845 26th Ave S.W. Photograph ordered by Bethlehem Pacific Coast Steel Corp. (San Francisco).


Factories; Steel industry; Bethlehem Pacific Coast Steel Corp. (Seattle);

D3017-11

Atlas Foundry furnace. Workman igniting the foundry's new furnace. Glimpse of the foundry interior as it was photographed in January of 1937.


Atlas Foundry & Machine Co. (Tacoma); Foundries--Tacoma--1930-1940; Steel industry--Tacoma--1930-1940;

D3017-2

Atlas Foundry furnace as photographed in January of 1937. Workmen inside foundry. Laborer pouring glowing molten iron or steel into barrel. The process appears to be the method and machinery used prior to the foundry's installation of a new furnace.


Atlas Foundry & Machine Co. (Tacoma); Foundries--Tacoma--1930-1940; Steel industry--Tacoma--1930-1940;

873-10

American Smelting and Refining Company (ASARCO), Tacoma. Glowing, molten liquid ore pouring from a reverbatory furnace into a huge ladle. Two workers on the left are dwarfed by the size of the equipment. The furnace heats the ore to 2,700 degrees Farenheit. For J. Gius, reporter. (T. Times 1/19/1935, pg. 1)


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

873-4

General overview of the American Smelting and Refining Company (ASARCO), Tacoma, as it appeared in 1935. Once the tallest smoke stack in the world, the brick structure billows smoke as it looms far above its industrial buildings. The stack was imploded in the 1990s after the refinery closed. (T. Times 1/19/1935, pg. 1)


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

80-10091

The American Smelting & Refining Co. (ASARCO Incorporated) Tacoma Plant. TPL-2353. Areas of the plant are labelled with arrows and typed notations. Typed notations read, left hand side, top to bottom: Main Stack, Silos, ESP'S (Hoppers), Flue, Metallic Arsenic Area, Arsenic Kitchens, Arsenic Roasters (Hoppers, Roaster Baghouse Hoppers, Herreshoff Roasters), Acid Plant Bldg (Settling Tanks & Basin), Fine Ore Storage (Settling, evaporation and neutralization impoundment Waste Piles), Liquid SO2 Plant. Across the top, left to right: Laboratory Container Storage, Reverberatory Furnaces, Oil Tanks, Refineries, Settling & Evaporation Basins. Right hand side, top to bottom: Slag Dump, Casting Furnace, Anode Furnaces, Nickel Plant, Converters, Unloading Dock, Crushing & Sampling Mill, Incinerator, and Ore Piles. TPL-2353, TPL-6246


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1950-1960; Copper industry--Tacoma--1950-1960;

D7419-2

Star Iron & Steel Company bridge fabricated in five days for Whidbey Island-Mukilteo ferry landing. Becholdt trailer pulled by Cooney Transfer & Storage Company truck on August 23, 1938, transports the 30,000 pound, 64-foot long steel bridge. (T. Times, 8/23/1938, p.3).


Star Iron & Steel Co. (Tacoma); Cooney Transfer & Storage Co. (Tacoma); Bridges--Whidbey Island; Trailers; Shipping--Tacoma--1930-1940;

D7419-4

Close-up view on August 23, 1938, of Star Iron & Steel Company bridge constructed in five short days for damaged Whidbey Island-Mukilteo ferry landing. The 30,000 pound, 64-foot long steel structure balances on a special Becholdt-made trailer. (T. Times, 8/23/38, p.3).


Star Iron & Steel Co. (Tacoma); Cooney Transfer & Storage Co. (Tacoma); Bridges--Whidbey Island; Trailers; Shipping--Tacoma--1930-1940;