William Trueblood TPL-6348

Open original Digital object

Identity elements

Reference code

Name and location of repository

Level of description

Item

Title

William Trueblood TPL-6348

Date(s)

  • 1961-04-06 (Creation)

Extent

Name of creator

(12/31/1914-6/14/1983)

Content and structure elements

Scope and content

Woodworth & Co. workers are dwarfed by the size of concrete beams spanning Wakefield Drive (South Tacoma Way) and Center Street. The Yakima Avenue Bridge is under construction after voters approved a $1.5 million dollar bond to finance the project. Designed by Horace Whitacre, the new Tacoma bridge is the highest pre-stressed concrete span in Washington State. The steeple of Holy Rosary Church can be seen in the background. Trueblood #451.


Bridge construction--Tacoma; Structural frames; Girders; Concrete; Scaffolding; Woodworth & Co. (Tacoma); Yakima Avenue Bridge (Tacoma); Whitacre, Horace;

System of arrangement

Conditions of access and use elements

Conditions governing access

Technical access

Conditions governing reproduction

Languages of the material

Scripts of the material

Language and script notes

Finding aids

Acquisition and appraisal elements

Custodial history

Immediate source of acquisition

Appraisal, destruction and scheduling information

Accruals

Existence and location of originals

Existence and location of copies

Related archival materials

Related descriptions

Notes element

Specialized notes

Alternative identifier(s)

Rules or conventions

Sources used

Access points

Subject access points

Place access points

Name access points

Genre access points

Digital object metadata

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Accession area

Related subjects

Related people and organizations

Related genres

Related places