Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
A116457-10
Date(s)
- 1958-09-03 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Men cling gingerly at the top of the steel transmission tower under construction while a mobile crane lifts another piece of the tower in a September 3, 1958, photograph. Key Construction Co. was in the process of building this transmission tower at the site of the Priest Rapids Dam. The dam was located in Grant County and completed in 1959. It was on the Columbia River, sixty miles from Richland. Photograph ordered by Bethlehem Pacific Coast Steel Corporation.
Steel; Towers; Hoisting machinery;