Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
BOLAND-B9382
Date(s)
- 1924-02-07 (Creation)
Extent
Name of creator
(1873-1950)
Content and structure elements
Scope and content
Water pipes are being hoisted and laid into a pre-dug, relatively shallow ditch at Camp Lewis on February 7, 1924. The start for a permanent Camp Lewis began with the laying of 10-inch cast-iron pipe from the camp's water supply source, Lake Sequalichew. The cast-iron pipe replaced the wooden pipe initially laid when the camp was first built. G69.1-131 (Tacoma Sunday Ledger, 2-17-24, 4-A)
Pipes (Conduits);