Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D11066-3
Date(s)
- 1941-04-03 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
These poles are the beginnings of a WPA constructed trestle viaduct that will span Pacific Highway, connecting Fort Lewis with the new 41st Division cantonment. The project is scheduled to be completed in three months. It is designed to eliminate bottle necks on Pacific Highway where it borders Fort Lewis and Camp Murray. (T. Times 4/3/1941, pg. 7)
Road construction--1940-1950; Fort Lewis (Wash.);