Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D12298-1
Date(s)
- 1941-12-11 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Newly completed bridge in Ruston. The 300 foot bridge spanned the gulch at Winnifred and N. 53rd St., 125 feet above the Northern Pacific railroad tunnel. The reinforced concrete structure replaced an outdated wooden structure. It cost $31,000. The official dedication and ribbon cutting was on December 13, 1941. (T. Times, 12/13/1941; 11/1/41, pg. 3; 12/13/41, pg. 3-Picture).
Bridges--Ruston--1940-1950; Bridge construction;