Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D12298-5
Date(s)
- 1941-12-11 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Newly completed bridge in Ruston. The new concrete structure was 300 feet long and spanned the gulch at Winnifred and N. 53rd St. It replaced an old and outdated wooden structure.
Bridges--Ruston--1940-1950; Bridge construction;