Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D160572-3
Date(s)
- 1971-06-19 (Creation)
Extent
Name of creator
Content and structure elements
Scope and content
Keel laying ceremonies. On June 19, 1971, the keel was laid at Martinolich Shipbuilding for a 100-foot X 25-foot sampan. The sampan is being built for Jack Shinsato and Angel Fishing Co., Ltd. A representative of the Shinsato family is pictured above applying a ceremonial welding to the keel. The man standing on the step above him has not been positively identified but may be a member of the Martinolich family. According to the sign on display before the keel, the sampan was scheduled for launching on November 25, 1971 and completed on December 10th. The fishing boat was actually launched a month ahead of time, on October 18, 1971, at Martinolich's Blair Waterway plant. Photograph ordered by Martinolich Shipbuilding Corp.
Sampans--Tacoma; Fishing boats--Tacoma--1970-1980; Boat & ship industry--Tacoma--1970-1980; Martinolich Shipbuilding Corp. (Tacoma);