Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D18195-3
Date(s)
- 1944-09-13 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Tacoma belt line new switching yard. Tacoma is building a new rail classification yard. The project is undertaken by the City Utilities Department Belt Line Division and will cost approximately $260,000. Left to right view of Mike Greely, Seattle laborer and Otto A. Roeder, Engineer, watching pipe disgorge black mud and salt water (T. Times, 9/13/44, p. 3).
Penstocks--Tacoma; Pipes; Railroad construction & maintenance--Tacoma; Tacoma Dept. of Public Utilities, Belt Line Division (Tacoma);