Content and structure elements
Scope and content
In February of 1936 the section of South Tyler that stretches from Snake Lake to South 66th Street was being built by hand by WPA workers. The new section of road was designed to open a large area west of South Tacoma. When finished the road would be 30 feet wide with a gravel surface. (T. Times 3/7/1936 p.9).
Works Progress Administration (Tacoma); Road construction--Tacoma--1930-1940; Laborers--Tacoma;