Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
D8772-1A
Date(s)
- 1939-08-24 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Waste heat boiler at the Tacoma smelter (ASARCO) installed by Puget Sound Machinery Depot, August 24, 1939.
American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;