- 2.6.3--35-18
- Item
Opheim dory. (inside view of aft half)
Opheim dory. (inside view of aft half)
Opheim dory. (inside view of bow)
Opheim dory. (inside view of bow)
Opheim dory. (inside view of stern)
Opheim dory. (inside view of stern)
Opheim dory. (aft end of boat showing motor well and centerboard well)
Opheim dory. (aft end of boat showing motor well and centerboard well)
Opheim dory. (aft end of boat showing motor well and centerboard well)vertical view.
Opheim dory.(bow, details of frames)
Mr. and Ms. William W. Seymour
Part of Thomas Handforth Collection
Bates boatbuilding, courtyard, T-38 . (lazarette, T-38)
Bates shop. (student using big band saw)
Bates shop. (Tom Mankin at work bench)
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman.
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, view from starboard-aft at ground level.
Dave, a Bates student, working at Eddon Boatworks, Gig Harbor.
Dave, a Bates student, working at Eddon Boatworks, Gig Harbor.
Eddon Boatworks and dock, Gig Harbor.
Bates boatbuilding, courtyard, T-38 (adding cold-molded layer of red cedar to cabin top; Patrick Chapman at lower left)
T-38, Bates boatbuilding shop courtyard (cabin interior, what appears to be galley table)
T-38, Bates boatbuilding shop courtyard (details of construction above bilge)
T-38, details of bilge and mast step.
Bates shop, scarfing parts of backbone (Honduras mahogany) for Trumbly's Windance.
Bates shop, scarfing parts of backbone (Honduras mahogany) for Trumbly's Windance, clamps removed, showing massive scarf joint.
T-38, aft end from ground level, rudder installed.
T-38, aft end from ground level, rudder installed.(detail of rudder mount)
T-38, rudder, detail showing interior bold holding rudder to shaft.