10-3
Bates boatbuilding shop; Joe Trumbly and Patrick Chapman with dory Patrick built.
10-5
Students working on cabin top of T-38.
10-7
Students working on topsides of T-38.
11-10
Loft of boatbuilding shop; Patrick Chapman in foreground gluing mast.
11-11
Loft of boatbuilding shop; Assembling mast.
11-12
Gluing and assembling mast for T-38. Patrick Chapman in foreground; Armen Melkonian, Mark Klarich, Rob Cramblett in background.
11-13
Rob Cramblett clamping glued mast for T-38.
11-14
Clamping glued mast for T-38.
11-16
Clamped mast for T-38.Tim Chambers in foreground.
11-17
Clamped mast for T-38.Tim Chambers in foreground.
11-21
Clamped and wedged mast for T-38.
11-3
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
11-4
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
11-5
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
11-6
Bates boatbuilding shop, loft, mast for T-38 under construction.
11-7
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
12-11
Windance under shed, skeleton constructed. Irving Warner in photo.