- 2.6.3--42-16
- Item
Inside Brian Saucier's boat before planking. Frame molds, frames, ribbands & stringers.
755 results with digital objects Show results with digital objects
Inside Brian Saucier's boat before planking. Frame molds, frames, ribbands & stringers.
T-38, student working on galley cabinetry; Trumbly-designed gimballed stove installed.
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
Bates student working on what looks like a bunk for T-38.
T-38 (mast step)vertical view.
T-38 (student installing teak decking in cockpit)
Bates boat shop, courtyard, T-38 mast.
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
Loft of boatbuilding shop; Patrick Chapman in foreground gluing mast.
Gluing and assembling mast for T-38. Patrick Chapman in foreground; Armen Melkonian, Mark Klarich, Rob Cramblett in background.
Clamping glued mast for T-38.
Bates boatbuilding, courtyard, T-38 (adding cold-molded layer of red cedar to cabin top; Patrick Chapman at lower left)
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, Bates boatbuilding shop courtyard (rear of engine and floor beams)
T-38, details of bilge and mast step.
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
T-38, cabin top, with exposed beams.
T-38, garboard plank screwed down.
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.)
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.)
T-38 (students installing teak decking on fordeck)
Students moving mast for T-38 after painting in courtyard.
Bates boatbuilding shop, loft, mast for T-38 under construction.
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
Loft of boatbuilding shop; Assembling mast.
Clamped mast for T-38.Tim Chambers in foreground.