- 2.6.3--1-4
- Item
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Patrick Chapman center, Dean Goodrich right.
755 results with digital objects Show results with digital objects
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Patrick Chapman center, Dean Goodrich right.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
T-38, Bates, cabin top and deck.
T-38, Armen Melkonian working on cockpit.
T-38, construction inside cabin.
T-38, cabin and foredeck under construcion, Burton in photo.
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
Plugged holes, topsides of T-38.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
T-38 under construction, Bates courtyard.
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
T-38 under construction, Bates courtyard. (Work ongoing in open cabin.)
Bates boatbuilding, courtyard, T-38 (adding cold-molded layer of red cedar to cabin top; Patrick Chapman at lower left)
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, Bates boatbuilding shop courtyard (rear of engine and floor beams)
T-38, details of bilge and mast step.
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
T-38, cabin top, with exposed beams.
T-38, garboard plank screwed down.