Showing 755 results
Collections- 2.6.3--22-3
- Item
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
- 2.6.3--22-5
- Item
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
- 2.6.3--22-6
- Item
Plugged holes, topsides of T-38.
- 2.6.3--24-8
- Item
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
- 2.6.3--X-9
- Item
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
- 2.6.3--31-5
- Item
T-38 under construction, Bates courtyard.
- 2.6.3--31-8
- Item
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
- 2.6.3--31-10
- Item
T-38 under construction, Bates courtyard. (Work ongoing in open cabin.)
- 2.6.3--1-3
- Item
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38).
- 2.6.3--BatesBWmisc-13
- Item
Patrick chapman making plank pattern for T-38, Bates.
- 2.6.3--1-2
- Item
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38).
- 2.6.3--BatesBWmisc-14
- Item
Dan Hubley plugging screw holes on T-38, Bates.
- 2.6.3--BatesBWmisc-16
- Item
T-38, Bates, spring/summer 1978, topsides; cabin framed but not decked.
- 2.6.3--47-11
- Item
Trumbly's 52-foot Windance, Raft Island, shaft boring jig in action, seen from below keel (Trumbly holding drilling rod)
- 2.6.3--47-14
- Item
Trumbly's 52-foot Windance, Raft Island, shaft boring jig in action, seen from below keel (vertical shot, Trumbly operating drill motor)
- 2.6.3--30-16
- Item
Joe Trumbly trimming rabbet on Brian Saucier's keel with adze; Brian looking on.
- 2.6.3--30-19
- Item
Joe Trumbly trimming rabbet on Brian Saucier's keel with adze; Brian looking on.
- 2.6.3--30-21
- Item
Joe Trumbly explaining something to Brian Saucier
- 2.6.3--29-1
- Item
Backbone of Brian Saucier's boat under construction in Bates shop. (Trumbly explaining something.)
- 2.6.3--24-16
- Item
Interior, Bates shop. (L to R, Tom Mankin, Trumbly, Rob Cramblett.)
- 2.6.3--30-15
- Item
View of Bates shop from loft.
- 2.6.3--33-18
- Item
Tool made and used in Bates shop. I forget what it is for.
- 2.6.3--33-20
- Item
Display (made by Trumbly) in Bates shop, showing stages in making wooden models for propellers, used in sand-casting in bronze.
- 2.6.3--47-9
- Item
Trumbly's 52-foot Windance, Raft Island, shaft boring jig in action, seen from below keel (shaft boring view from top of keel; Trumbly measuring with calipers)
- 2.6.3--44-20
- Item
Bates boatbuilding shop (view from loft; Trumbly at lower left talking with someone)
- 2.6.3--22-24
- Item
Etta Trumbly on deck of the Trumblys' A-frame home, Raft Island.