- Subseries
Showing 795 results
Collections755 results with digital objects Show results with digital objects
- 2.6.3--4-24
- Item
Tacoma - Garza Star and tug Shannon Foss, Hylebos Waterway.
- 2.6.3--4-26
- Item
Tacoma - Garza Star (Japan) loaded with timber, Hylebos Waterway.
- 2.6.3--5-15
- Item
Tacoma, one of waterways, floating dry dock.
- 2.6.3--18-1
- Item
View from old Tacoma Boat Market shop, Ruston Way.
- 2.6.3--21-8
- Item
Back side of old Tacoma Boat Market shop, Ruston Way.
- Subseries
- Item
- 2.6.3--BatesBWmisc-14
- Item
Dan Hubley plugging screw holes on T-38, Bates.
- 2.6.3--BatesBWmisc-16
- Item
T-38, Bates, spring/summer 1978, topsides; cabin framed but not decked.
- 2.6.3--1-4
- Item
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Patrick Chapman center, Dean Goodrich right.
- 2.6.3--1-10
- Item
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
- 2.6.3--1-12
- Item
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
- 2.6.3--3-21
- Item
T-38, Bates, cabin top and deck.
- 2.6.3--8-21
- Item
T-38, Armen Melkonian working on cockpit.
- 2.6.3--17-8
- Item
T-38, construction inside cabin.
- 2.6.3--17-9
- Item
T-38, cabin and foredeck under construcion, Burton in photo.
- 2.6.3--22-3
- Item
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
- 2.6.3--22-5
- Item
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
- 2.6.3--22-6
- Item
Plugged holes, topsides of T-38.
- 2.6.3--24-8
- Item
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
- 2.6.3--X-9
- Item
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
- 2.6.3--31-5
- Item
T-38 under construction, Bates courtyard.