10-7
Students working on topsides of T-38.
11-10
Loft of boatbuilding shop; Patrick Chapman in foreground gluing mast.
11-11
Loft of boatbuilding shop; Assembling mast.
11-12
Gluing and assembling mast for T-38. Patrick Chapman in foreground; Armen Melkonian, Mark Klarich, Rob Cramblett in background.
11-13
Rob Cramblett clamping glued mast for T-38.
11-14
Clamping glued mast for T-38.
11-16
Clamped mast for T-38.Tim Chambers in foreground.
11-17
Clamped mast for T-38.Tim Chambers in foreground.
11-21
Clamped and wedged mast for T-38.
11-3
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
11-4
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
11-5
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
11-6
Bates boatbuilding shop, loft, mast for T-38 under construction.
11-7
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
12-7
Joe Trumbly in home shop, ground floor of A-frame, raft Island.
12-9
Bates shop, the two Deans. Dean Goodrich (left); other Dean's last name I don't remember.
13-1
Knapp Boatbuilding, Macs' Effort on mobile cradle (just emerged from shop).
13-11
Macs' Effort at Hylebos Boat Haven for launching.
13-12
Don Knapp kneeling at stern of Macs' Effort at launching dock.
13-13
MacPherson brothers (left) and Chuck Knapp examining shaft & propellor of Macs'.
13-14
Griz (left) sitting while Chuck Knapp does something with propeller assembly.
13-15
Griz (left) sitting while Chuck Knapp does something with propeller assembly.
13-16
Don Knapp facing camera at stern of Macs' Effort.