- Item
- 1926
Part of Richards Studio Photographs
ca. 1926. A furnace manufactured by the Gabriel Tubular Furnace Co., circa 1926, in Tacoma. The company had relocated from Seattle and was located at 1117 Tacoma Ave So. The furnaces were manufactured under the supervision of the Gehri Co., G.F. Gehri was president and Ernst Feix was the secretary-treasurer. The innovative furnace used no fire brick. In place of the brick, the fire box was surrounded by three inch steel tubes in a vertical position which radiated heat directly from the fire box to various feed pipes to the rooms. This method eliminated waste heat through radiation and reduced the consumption of fuel by 25-33 1/3 per cent. (TDL 5/2/1926, pg. E-10)(WSHS)
Gabriel Tubular Furnace Co. (Tacoma); Furnaces--Tacoma;