- 2.6.3--8-21
- Item
T-38, Armen Melkonian working on cockpit.
T-38, Armen Melkonian working on cockpit.
T-38, construction inside cabin.
T-38, cabin and foredeck under construcion, Burton in photo.
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
Plugged holes, topsides of T-38.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
T-38 under construction, Bates courtyard.
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
T-38 under construction, Bates courtyard. (Work ongoing in open cabin.)
Bates boatbuilding, courtyard, T-38 (adding cold-molded layer of red cedar to cabin top; Patrick Chapman at lower left)
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, Bates boatbuilding shop courtyard (rear of engine and floor beams)
T-38, details of bilge and mast step.
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
T-38, cabin top, with exposed beams.
T-38, garboard plank screwed down.
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.)
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.)
T-38 (students installing teak decking on fordeck)
Students moving mast for T-38 after painting in courtyard.
Bates boatbuilding shop, loft, mast for T-38 under construction.