Showing 2783 results

Collections
Richards Studio Photographs Industries Image
Advanced search options
Print preview View:

2783 results with digital objects Show results with digital objects

D7885-5

The Mountain Lumber Company, February 1939. The Mountain Lumber Company, at 919 East F. Street, was built in 1924 and began cutting lumber in February of 1925. The main mill building was destroyed by fire in July of 1931. The company re-opened before the end of the year, and they were part of Tacoma's busy waterfront until the mid-1940s.


Mountain Lumber Co. (Tacoma); Lumber industry--Tacoma--1930-1940;

D7885-7

A workman at the Mountain Lumber Company stands on a stack of boards as a crane swings them through the air in this photograph from February 1939. The Mountain Lumber Company, at 919 East F. Street, was built in 1924 and began cutting lumber in February of 1925. The main mill building was destroyed by fire in July of 1931. The company re-opened before the end of the year, and they were part of Tacoma's busy waterfront until the mid-1940s.


Mountain Lumber Co. (Tacoma); Lumber industry--Tacoma--1930-1940;

D7885-2

Mountain Lumber Co. Paull Billings - Manager. Small building in front with trestle and lumber piles around it.


Mountain Lumber Co. (Tacoma); Lumber industry--Tacoma--1930-1940;

D7885-8

Exterior of Mountain Lumber Company with piles of lumber. Paul Billings, Manager.


Mountain Lumber Co. (Tacoma); Lumber industry--Tacoma--1930-1940;

A8043-2

Former Lincoln automobile dealership, new home of Olympic Dairy at 9th and K Street in March of 1939. Photograph ordered by Corky Maybin at the Tacoma Times. The structure was built in 1925 from a design by C.F.W. Lundberg for Mutual Motors. It was home to Donoghue Chevrolet, American Motors Inc. and Tommy Burns Inc. before becoming the new plant for the Olympic Dairy in 1939. Remodeling the structure and adding modern equipment cost Olympic more than $75,000. The 30 year old firm did not move any of their old equipment to their new plant. (filed with Argentum) (T. Times 3/30/1939, pg. 7)


Olympic Dairy (Tacoma); Dairying--Tacoma--1930-1940;

A8044-4

Tacoma Dairy truck at the dairy's plant, 1802 E. 27th St. The structure was built in 1926. (filed with Argentum)


Tacoma Dairy (Tacoma); Dairy products industry--Tacoma;

D8116-10

The launching of the U.S. Navy Destroyer 408, the U. S. S. Wilson, took place April 12, 1939 at the Puget Sound Navy Yard, Bremerton. At 90% complete, the vessel was 341-feet-long with 1725 tons displacement. It carried a complement of 9 officers and 175 men. It was commissioned July 5, 1939 and received eleven battle stars for service in World War II. After sustaining damage during the war, it was selected as a target during the atom bomb test at Bikini Atoll in July of 1946. It was decommissioned in August of 1946 but remained afloat and was finally scuttled off Kwajelein in March of 1948. (T. Times, 4/13/39, p.20)


Launchings--Bremerton--1930-1940; Puget Sound Naval Shipyard (Bremerton); Naval yards & naval stations--Bremerton--1930-1940; Government vessels; Warships--Bremerton--1930-1940;

D8116-7

Launching of the U.S. Navy Destroyer #408, the U. S. S. Wilson, on April 12, 1939. The ship was decorated with pennants and bunting and photographed at dock in the Puget Sound Navy Yard at Bremerton. Ship launchings at the Navy yard differed from those at Tacoma Shipyards. The craft was built in a construction dock which was flooded for launching, much like a bathtub. The launching consisted of the gates being opened and the boat towed out into the Sound. The destroyer under construction in the background was almost entirely submerged during the ceremony. (T. Times 4/13/1939, p. 20)


Launchings--Bremerton--1930-1940; Puget Sound Naval Shipyard (Bremerton); Naval yards & naval stations--Bremerton--1930-1940; Government vessels; Warships--Bremerton--1930-1940;

D8116-5

The destroyer USS Wilson (#408) was launched April 12,1939 at the Puget Sound Navy Yard in Bremerton. On hand for the launching were, left to right, Rear Admiral E. B. Fenner, Mrs. Fenner (sponsor), Governor Clarence Martin, Mrs. Arthur B. Langlie, Major General Walter C. Sweeney. Mrs. Sweeney, and Seattle Mayor Arthur Langlie. The vessel was named after Seaman Charles Wilson, who was recognized for distinguished service in the Navy during the Civil War. (T.Times 4/13/1939, pg. 20)


Launchings--Bremerton--1930-1940; Puget Sound Naval Shipyard (Bremerton);Martin, Clarence D., 1887-1955; Governors; Langlie, Arthur B., 1900-1966; Mayors--Seattle; Fenner, Edward B.; Sweeney, Walter C.;

A8103-2

Intact Medosweet Dairy truck, photograph ordered by Fageol Motor Sales Co., 717 Dexter, Seattle. (filed with Argentum)


Medosweet Dairies, Inc. (Tacoma); Trucks--Tacoma--1930-1940;

D8311-4

Logging pond at Port Piers. For R.E. Chase, 601 Tacoma Building. Two men standing on logs in log pond, pushing on logs with long poles. Industries to the right and in background. Photograph taken on May 11, 1939.


Logs; Port of Tacoma (Tacoma);

D8311-6

Logging pond at Port Piers. For R. E. Chase, 601 Tacoma Building.


Logs; Lumber industry--Tacoma--1930-1940;

D8564-1

On May 22, 1939, employees at the St. Paul & Tacoma Lumber Co. mill walked out, halting operations in support of their fellow striking employees at the logging camps. The workers at the camps had ceased work on May 15th. Employees at the mill walked out and filed formal charges of unfair labor practices against the company when they found out that officials planned to keep the mill running, processing logs from other sources. (T. Times 5/23/1939, pg. 3-article only)


Lumber industry--Tacoma--1930-1940; St. Paul & Tacoma Lumber Co. (Tacoma); Strikes--Tacoma--1930-1940;

D8564-4

Assembly of St. Paul employees out on strike between 7 and 9:15 a.m. Automobile, several new, parked along street. Group of men milling around. Two-story, wood-frame building in background with large trees in median strip.


Lumber industry--Tacoma--1930-1940; St. Paul & Tacoma Lumber Co. (Tacoma); Strikes--Tacoma--1930-1940;

D8564-3

Assembly of St. Paul employees out on strike. View from roof of building. Partial view of strikers on left and automobiles parked along street. Building in background appears to be Washington Handle Company.


Lumber industry--Tacoma--1930-1940; St. Paul & Tacoma Lumber Co. (Tacoma); Strikes--Tacoma--1930-1940;

D8564-5

Assembly of St. Paul employees out on strike between 7 and 9:15 a.m. Group of about 70 men gathered in front of open building, probably mill entrance. Lumber mill buildings in background and wooden sidewalk in foreground.


Lumber industry--Tacoma--1930-1940; St. Paul & Tacoma Lumber Co. (Tacoma); Strikes--Tacoma--1930-1940;

A8772-1

Waste - heat boilers at Tacoma Smelter - mass of pipe within steel frame at angle. (filed with Argentum)


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

A8772-2

Waste-heat boilers at Tacoma Smelter (ASARCO) showing pipes within frame work, some pipes continue to floor below. (filed with Argentum)


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

A8772-3

Waste - heat boilers at Tacoma Smelter - mass of pipe within steel frame at angle. (filed with Argentum)


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

A8772-4

Waste-heat boilers at Tacoma Smelter (ASARCO) showing pipes within frame work, some pipes continue to floor below.


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

D8772-1A

Waste heat boiler at the Tacoma smelter (ASARCO) installed by Puget Sound Machinery Depot, August 24, 1939.


American Smelting & Refining Co. (Tacoma); Smelters--Tacoma--1930-1940; Copper industry--Tacoma--1930-1940; Industrial facilities--Tacoma;

A10361-9

ca. 1940. Pennsylvania Salt Mfg. Co. Gauges for Boiler No.2. The large chemical producing company was located in the Tideflats, along the Hylebos Waterway.


Pennsylvania Salt Manufacturing Co. of Washington (Tacoma); Gauges; Chemical industry--Tacoma--1940-1950; Industrial facilities--Tacoma--1940-1950;

7A1-2

ca. 1940. Columbia Breweries, the manufacturers of Alt Heidelberg and Columbia Ale. Columbia was established in 1900 and had a 41 year record of nonstop continuous brewing. This elevated view shows the plant's facade, automobiles along the street and a delivery truck is backed up to door. A hill and residential buildings are seen in the background. (Argentum)


Brewing industry--Tacoma--1940-1950; Columbia Breweries, Inc. (Tacoma)--1940-1950;

7A1-3

ca. 1940. Columbia Breweries, the manufacturers of Alt Heidelberg and Columbia Ale were getting ready to go through a massive expansion and modernization of their brewing facilities and offices. Columbia was established in 1900 and had a 41 year record of nonstop continuous brewing. During the dry period they produced "Columbia Brew", a near beer. This elevated view shows the plant's facade, automobiles along the street and a delivery truck is backed up to door. A hill and residential buildings are seen in the background. (WSHS)


Brewing industry--Tacoma--1940-1950; Columbia Breweries, Inc. (Tacoma)--1940-1950;

C11285-13

ca. 1940. Side view of freighter Cape Flattery, second vessel launched by the Sea-Tac Shipyard, at anchor. (Argentum)


Seattle-Tacoma Shipbuilding Corp. (Tacoma); World War, 1939-1945--Economic & industrial aspects--Tacoma; Boat & ship industry--Tacoma--1940-1950;

C11285-14

ca. 1940. Bow view of freighter "Cape Flattery", second vessel launched by the Seattle-Tacoma Shipbuilding Corporation. The Cape Flattery served as a troopship beginning in 1943. The vessel was scrapped in 1971. (Argentum)


Seattle-Tacoma Shipbuilding Corp. (Tacoma); World War, 1939-1945--Economic & industrial aspects--Tacoma; Boat & ship industry--Tacoma--1940-1950;

A10361-2

ca. 1940. Pennsylvania Salt Mfg. Co. boiler at chemical plant located in industrial Tideflats. This photograph was taken circa 1940.


Pennsylvania Salt Manufacturing Co. of Washington (Tacoma); Boilers; Chemical industry--Tacoma--1940-1950; Industrial facilities--Tacoma--1940-1950;

D9368-7

Seattle-Tacoma Shipbuilding Corp. Building under construction on the old Todd Shipyards site in Tacoma's industrial Tideflats area. Photograph taken on January 31, 1940. (T. Times)


Seattle-Tacoma Shipbuilding Corp. (Tacoma); Building construction--Tacoma--1940-1950; Progress photographs; Boat & ship industry--Tacoma--1940-1950; World War, 1939-1945--Economic & industrial aspects--Tacoma;

A10788-1

Union Pacific Railroad display in roof garden of Winthrop Hotel. Advertising placards promoting the lumber industry.


Union Pacific Railroad Co. (Tacoma)--Exhibitions & displays; Hotel Winthrop (Tacoma); Lumber industry--1940-1950;

D9484-5

Laying of first keel at Seattle-Tacoma Shipbuilding Corporation. Seattle Mayor Arthur Langlie, center (later Governor), kneels down to help with equipment. Governor Clarence Martin is standing above him and Tacoma Mayor J. J. Kaufman, with hardhat on left, are among those in the forefront of this March 5, 1940 photograph. (T. Times)


Seattle-Tacoma Shipbuilding Corp. (Tacoma); Boat & ship industry--Tacoma--1940-1950; Langlie, Arthur B., 1900-1966; Mayors--Seattle; Martin, Clarence D., 1887-1955; Governors; Kaufman, Joseph J.; Mayors--Tacoma--1940-1950;

Results 181 to 210 of 2783