- 2.6.3--22-24
- Item
Etta Trumbly on deck of the Trumblys' A-frame home, Raft Island.
755 results with digital objects Show results with digital objects
Etta Trumbly on deck of the Trumblys' A-frame home, Raft Island.
Backbone of Brian Saucier's boat under construction in Bates shop. (Trumbly in motion.)
Joe Trumbly trimming rabbet on Brian Saucier's keel with adze; Brian looking on.
Joe Trumbly with chisel, examining Saucier's keel.
Student Rob Cramblett in Bates boatbuilding shop.
Bates boat building shop; Rob Cramblett (front), Dean Goodrich (back); Brian Saucier(?) mooning for the camera.
Bates shop. (Tom Mankin at work bench)
Patrick chapman making plank pattern for T-38, Bates.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Patrick Chapman center, Dean Goodrich right.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
Dean Goodrich (fore) and another student beginning to lay decking on T-38.
T-38, forward planking, with partly caulked seam.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Patrick Chapman).
T-38; lower frames exposed, planking underway. (Patrick Chapman spiling for next plank.)
T-38 under construction, Bates courtyard. (Patrick Chapman on fore deck.)
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
Bates boatbuilding, courtyard, T-38 . (lazarette, T-38)
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
T-38, rudder, detail showing interior bold holding rudder to shaft.
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
Patrick Chapman standing below bow of T-38.
Bates boatbuilding, T-38, view of topsides, with red cedar layer installed on main deck; cabin top beams in place but no planking.