Showing 795 results
Collections755 results with digital objects Show results with digital objects
- 2.6.3--24-9
- Item
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Patrick Chapman).
- 2.6.3--24-15
- Item
T-38; lower frames exposed, planking underway. (Patrick Chapman spiling for next plank.)
- 2.6.3--31-6
- Item
T-38 under construction, Bates courtyard. (Patrick Chapman on fore deck.)
- 2.6.3--31-9
- Item
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
- 2.6.3--36-11
- Item
Bates boatbuilding, courtyard, T-38 . (lazarette, T-38)
- 2.6.3--37-4
- Item
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
- 2.6.3--37-20
- Item
T-38, rudder, detail showing interior bold holding rudder to shaft.
- 2.6.3--45-2
- Item
- Bates boatbuilding, courtyard, T-38 (gluing and nailing bottom layer of red-cedar on deck; next layer was glued and nailed at right angles; then teak decking over that
- )
- 2.6.3--45-6
- Item
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
- 2.6.3--45-9
- Item
Patrick Chapman standing below bow of T-38.
- 2.6.3--46-8
- Item
Bates boatbuilding, T-38, view of topsides, with red cedar layer installed on main deck; cabin top beams in place but no planking.
- 2.6.3--46-11
- Item
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
- 2.6.3--46-12
- Item
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
- 2.6.3--5-4
- Item
Bates boat shop, courtyard, T-38 mast with student.
- 2.6.3--5-5
- Item
Bates boat shop, courtyard, T-38 mast with student.
- 2.6.3--5-6
- Item
Bates boat shop, courtyard, T-38 mast, view from above.
- 2.6.3--9-5
- Item
Students moving mast for T-38 after painting in courtyard.
- 2.6.3--11-17
- Item
Clamped mast for T-38.Tim Chambers in foreground.
- 2.6.3-16-19
- Item
Windance - backbone and molds - from inside.
- 2.6.3-22-17
- Item
Boatbuilding class setting up backbone of Windance, Raft Island.Trumbly at left.
- 2.6.3-22-19
- Item
Boatbuilding class setting up backbone of Windance, Raft Island.Trumbly at left.
- 2.6.3-22-26
- Item
Bates boat building class erecting Windance backbone, 2nd part.
- 2.6.3-22-32
- Item
Joe Trumbly planing element of backbone for a better fit. L to R, Trumbly, Tom Mankin, Rob Cramblett, Dean Goodrich, George Chambers, Tim Chambers.
- 2.6.3-22-33
- Item
2nd backbone element slides into place; Trumbly hamming it up in foreground.
- 2.6.3-43-5
- Item
Etta Trumbly at home, Raft Island.
- 2.6.3-43-7
- Item
Joe Trumbly standing next to backbone scarf.