- 2.6.3--45-3
- Item
- Bates boatbuilding, courtyard, T-38 (gluing and nailing bottom layer of red-cedar on deck; next layer was glued and nailed at right angles; then teak decking over that
- )(closer view)
76164 results with digital objects Show results with digital objects
T-38, student working on galley cabinetry; Trumbly-designed gimballed stove installed.
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
T-38, garboard plank screwed down.
Patrick Chapman standing below bow of T-38.
Drawing exhibited at Corcoran Gallery 1919
Part of Thomas Handforth Collection
Drawing exhibited at Corcoran Gallery 1919
Part of Thomas Handforth Collection
Drawing exhibited at Corcoran Gallery 1921
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
Part of Thomas Handforth Collection
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.)
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
T-38 (mast step)vertical view.
T-38 (student installing teak decking in cockpit)
T-38 (students installing teak decking on fordeck)
Bates boatbuilding, T-38, view of topsides, with red cedar layer installed on main deck; cabin top beams in place but no planking.