- 2.6.3--11-13
- Item
Rob Cramblett clamping glued mast for T-38.
70550 results with digital objects Show results with digital objects
Rob Cramblett clamping glued mast for T-38.
Bates boatbuilding, courtyard, T-38 . (lazarette, T-38)
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
T-38, rudder, detail showing interior bold holding rudder to shaft.
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)
Patrick Chapman standing below bow of T-38.
Bates boatbuilding, T-38, view of topsides, with red cedar layer installed on main deck; cabin top beams in place but no planking.
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
T-38, cabin top (Beams, made and installed by M. Dick and Patrick Chapman.). (cabin sides and top by M. Dick and P. Chapman)
Bates boat shop, courtyard, T-38 mast with student.
Bates boat shop, courtyard, T-38 mast with student.
Bates boat shop, courtyard, T-38 mast, view from above.
Clamped mast for T-38.Tim Chambers in foreground.
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman.
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, view from starboard-aft at ground level.
T-38, Bates boatbuilding shop courtyard (rear of engine and floor beams)
T-38, Bates boatbuilding shop courtyard (Trumbly-designed gimballed stove, built in Bates machine shop)
T-38, Bates boatbuilding shop courtyard (details of construction above bilge)
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
T-38, cabin top, deck beams, mast hole
Inside Brian Saucier's boat before planking. Frame molds, frames, ribbands & stringers.
T-38, student working on galley cabinetry; Trumbly-designed gimballed stove installed.
T-38; students clamping in garboard plank before screwing it down. (L to R, Armen Melkonian, Rob Cramblett)