Showing 795 results
Collections755 results with digital objects Show results with digital objects
- 2.6.3--22-3
- Item
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
- 2.6.3--22-5
- Item
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
- 2.6.3--22-6
- Item
Plugged holes, topsides of T-38.
- 2.6.3--24-8
- Item
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
- 2.6.3--X-9
- Item
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
- 2.6.3--31-5
- Item
T-38 under construction, Bates courtyard.
- 2.6.3--31-8
- Item
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
- 2.6.3--31-10
- Item
T-38 under construction, Bates courtyard. (Work ongoing in open cabin.)
- 2.6.3--37-5
- Item
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
- 2.6.3--37-9
- Item
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
- 2.6.3--37-10
- Item
T-38, Bates boatbuilding shop courtyard (cabin interior, what appears to be galley table)
- 2.6.3--37-18
- Item
T-38, aft end from ground level, rudder installed.
- 2.6.3--37-19
- Item
T-38, aft end from ground level, rudder installed.(detail of rudder mount)
- 2.6.3--38-5
- Item
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
- 2.6.3--38-11
- Item
T-38, foredeck, teak decking being laid over 2 layers of cold-molded red cedar.
- 2.6.3--39-5
- Item
T-38, bates courtyard. Students starting to fill seams in decking with rubber compound. L to R, Patrick Chapman (in front), Dean Goodrich, George Chambers, Rob Cramblett.)
- 2.6.3--9-4
- Item
Students moving mast for T-38 after painting in courtyard.
- 2.6.3--9-7
- Item
Students moving mast for T-38 after painting in courtyard.
- 2.6.3--11-4
- Item
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
- 2.6.3--11-5
- Item
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
- 2.6.3--11-13
- Item
Rob Cramblett clamping glued mast for T-38.
- 2.6.3--36-11
- Item
Bates boatbuilding, courtyard, T-38 . (lazarette, T-38)
- 2.6.3--37-4
- Item
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
- 2.6.3--37-20
- Item
T-38, rudder, detail showing interior bold holding rudder to shaft.