- 2.6.3--36-12
- Item
Bates shop. (student using big band saw)
Bates shop. (student using big band saw)
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38).
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Detail of shaft-boring jig.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Detail of shaft-boring jig.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38.
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
T-38 in courtyard, Bates boatbuilding shop.
T-38, rear shaft bearing and folding propeller.
Bates boatbuilding, keel of T-38.
T-38, cold-molded red-cedar decking just laid.
T-38, cabin sides being added (Patrick Chapman and Matthew Dick).
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
Bates shop. Cold-molding foredeck of T-38 with red cedar.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
T-38; lower frames exposed, planking underway.
T-38; lower frames exposed, planking underway. (T-38: cold-molding cabin top.)
Bates courtyard (T-38; cold-molding deck & cabin top with red cedar.)
Bates courtyard (T-38: cold-molding cabin top.)
T-38 under construction, Bates courtyard.
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman.
Bates courtyard, T-38 topsides, with cabin built by M. Dick and Patrick Chapman. (looking forward on topsides)
T-38, view from starboard-aft at ground level.
T-38, Bates boatbuilding shop courtyard (rear of engine and floor beams)
T-38, Bates boatbuilding shop courtyard (Trumbly-designed gimballed stove, built in Bates machine shop)
T-38, Bates boatbuilding shop courtyard (details of construction above bilge)
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.