7702 PHILLIPS RD SW, LAKEWOOD

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

7702 PHILLIPS RD SW, LAKEWOOD

Equivalent terms

7702 PHILLIPS RD SW, LAKEWOOD

Associated terms

7702 PHILLIPS RD SW, LAKEWOOD

16 Collections results for 7702 PHILLIPS RD SW, LAKEWOOD

16 results directly related Exclude narrower terms

D106030-4

A worker balances on a slender board high above the ground as he directs the placement of a steel truss on the new gym-auditorium at Hudtloff Junior High, under construction for the Clover Park School District. A crane is slowly lowering the steel joist so it joins others in line. The joists are 82 feet in length, the longest ever made by Arcweld Mfg. of Seattle for use in the Northwest. Bethlehem Pacific Coast Steel provided the steel used in the construction. G. Kirkebo & Sons are the contractors for the new school; it will replace the present Hudtloff Junior High upon completion. Photograph ordered by Bethlehem Pacific Coast Steel Corporation. (TNT 4-26-57, p. 22)


Building construction--Lakewood--1950-1960; A.G. Hudtloff Junior High School (Lakewood); Steel; Steel industry; Bethlehem Pacific Coast Steel Corp. (Seattle);

7702 PHILLIPS RD SW, LAKEWOOD

  • 14 images. Arthur G. Hudtloff Junior High School Charles V. Rueger, arch. G. Kirkebo & Sons, contr. -dedicated 1/29/1958
  • TNT 9/13/1955 p.14 Clover Park school site plans viewed
  • TNT 4/26/1957 p.22 Pattern in the sky (il under construction)
  • TNT 6/16/1957 p.B6 Hudtloff auditorium (interior il)
  • TNT 1/26/1958 p.A15 School dedication set (il)
  • TNT 9/28/1967 p.A10 Looters again hit Hudtloff Jr. High
  • TNT 4/7/1968 (obituary of A.G. Hudtloff)
  • TNT 7/5/1976 Hudtloff school torched; damage may be $500,000 (il)
  • Year Built: 1958
  • Decade Built: 1950s