Identity elements
Reference code
Name and location of repository
Level of description
Item
Title
A85803-2
Date(s)
- 1954-10-18 (Creation)
Extent
Name of creator
(1919-1980)
Content and structure elements
Scope and content
Operations at Heidelberg Brewing Co. were highly mechanized by the mid-1950's. A second brewing line was installed in the summer of 1954 which doubled the brewhouse capacity. Here a brewery employee keeps a careful eye on his large machine which appears to be in the bottling section. Photograph ordered by the Radio Corps. of America.
Machinery; Heidelberg Brewing Co. (Tacoma)--1950-1960; Brewing industry--Tacoma--1950-1960;