- 2.6.3--6-12
- Item
Chuck Knapp fairing sheer log of Aquila; Jimmy Burba in foreground.
755 results with digital objects Show results with digital objects
Chuck Knapp fairing sheer log of Aquila; Jimmy Burba in foreground.
Chuck Knapp fairing sheer log of Aquila; Jimmy Burba watching.
Chuck Knapp (left), Earl Edwards in front of plug for Aquila.
CLK Yacht Crafters, finished strongback for Aquila, Chuck Knapp (fore left), Earl Edwards (fore right) and Jim Burba (back left).
Knapp Boatbuilding, lofting floor for Aquila.
Plug of Aquila with center flange. (Near rear.)
Plug of Aquila with center flange.(Chuck standing on top)
Aquila plug with center flange.
CLK Yacht Crafters, MH Dick at bow of Aquila plug.
Completed Aquila plug.(L to R, Mark Klarich and Gary [carpenter])
Aquila plug, with keel insert and completed center flange.
CLK Yacht Crafters; sanding Aquila plug. (view from outside, through shop doors.)
Aquila plug, aft. (L to R, M. Dick and "Griz").
Jim Burba grabbing leg of Sandra Marcy ("Breezy").
CLK Yacht Crafters, Aquila plug
CLK Yacht Crafters, workers sanding Aquila plug.
Floor timbers (engine mount?), midships, seen from above.
Side frames, planking, sheer clamp, upper deck from inside.
Stem and bow planking, outside.
Field trip to unidentified shop. (Students examining fiberglass mold.)
Field trip to unidentified shop. (Fiberglass deck and cockpit of sailboat, or plug)
Tacoma, Bates boatbuilding class field trip to Jones-Goodell yard, wooden yacht under construction.
Tacoma, Bates boatbuilding class field trip to Jones-Goodell yard, wooden yacht under construction. (interior)
Stern, Trumbly? (L) talking with worker.
Bottom frames and planking, keel, lengthwise members (close-up view)
View alongside of yacht, looking forward.