- 2.6.3--8-21
- Item
T-38, Armen Melkonian working on cockpit.
70550 results with digital objects Show results with digital objects
T-38, Armen Melkonian working on cockpit.
T-38, construction inside cabin.
T-38, cabin and foredeck under construcion, Burton in photo.
Plugging decking of T-38 (George Chambers looking toward camera, Armen Melkonian behind him.)
Plugging decking of T-38 (Armen Melkonian looking toward camera.)
Plugged holes, topsides of T-38.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Rob Cramblett).
Inside cabin of T-38: unid. person working on stove cabinetry or fittings.
T-38 under construction, Bates courtyard.
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
T-38 under construction, Bates courtyard. (Work ongoing in open cabin.)
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
T-38, Bates boatbuilding shop courtyard (floor beams and bilge, with mast step)
T-38, Bates boatbuilding shop courtyard (cabin interior, what appears to be galley table)
T-38, aft end from ground level, rudder installed.
T-38, aft end from ground level, rudder installed.(detail of rudder mount)
Bates shop, T-38, foredeck, teak decking being laid over double layer of cold-molded red cedar.
T-38, foredeck, teak decking being laid over 2 layers of cold-molded red cedar.
T-38, bates courtyard. Students starting to fill seams in decking with rubber compound. L to R, Patrick Chapman (in front), Dean Goodrich, George Chambers, Rob Cramblett.)
Students moving mast for T-38 after painting in courtyard.
Students moving mast for T-38 after painting in courtyard.
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).