Print preview Close

Showing 755 results

Collections
Matthew Dick Boat Building Photographs With digital objects
Print preview View:

45-2

  • Bates boatbuilding, courtyard, T-38 (gluing and nailing bottom layer of red-cedar on deck; next layer was glued and nailed at right angles; then teak decking over that
  • )

46-8

Bates boatbuilding, T-38, view of topsides, with red cedar layer installed on main deck; cabin top beams in place but no planking.

22-32

Joe Trumbly planing element of backbone for a better fit. L to R, Trumbly, Tom Mankin, Rob Cramblett, Dean Goodrich, George Chambers, Tim Chambers.

Results 31 to 60 of 755