- 2.6.3--11-5
- Item
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
755 results with digital objects Show results with digital objects
Bates boatbuilding shop, loft, mast for T-38 under construction. (with Patrick Chapman).
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
Dean Goodrich (fore) and another student beginning to lay decking on T-38.
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
Bates boatbuilding shop, loft, mast for T-38 under construction. (Tom Mankin in background.)
Clamped and wedged mast for T-38.
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
Clamped mast for T-38.Tim Chambers in foreground.
Clamped mast for T-38.Tim Chambers in foreground.
Clamping glued mast for T-38.
Rob Cramblett clamping glued mast for T-38.
Gluing and assembling mast for T-38. Patrick Chapman in foreground; Armen Melkonian, Mark Klarich, Rob Cramblett in background.
Loft of boatbuilding shop; Assembling mast.
Loft of boatbuilding shop; Patrick Chapman in foreground gluing mast.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
Students working on topsides of T-38.
Students working on cabin top of T-38.
Bates boatbuilding shop; Joe Trumbly and Patrick Chapman with dory Patrick built.
Bates boatbuilding, keel of T-38.
Bates boatbuilding, keel of T-38.