- 2.6.3--10-15
- Item
Bates boatbuilding, keel of T-38.
755 results with digital objects Show results with digital objects
Bates boatbuilding, keel of T-38.
Dean Goodrich plugging countersink holes on T-38.
Bench being framed inside cabin of T-38.
T-38, people working in open cabin; head at lower right, Tom Mankin.
T-38 under construction, Bates courtyard. (Two students installing plank.)
T-38. (Student installing a plank.)
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Patrick Chapman center, Dean Goodrich right.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38. Keel of T-38.
Dean Goodrich (fore) and another student beginning to lay decking on T-38.
T-38, forward planking, with partly caulked seam.
Bates shop. Cold-molding foredeck of T-38 with red cedar. (Patrick Chapman).
T-38; lower frames exposed, planking underway. (Patrick Chapman spiling for next plank.)
T-38 under construction, Bates courtyard. (Patrick Chapman on fore deck.)
T-38 under construction, Bates courtyard. (Dave Burton, on right, installing plank.)
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Detail of shaft-boring jig.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38 (T-38). Detail of shaft-boring jig.
George Chambers setting up shaft boring jig for rudder shaft on Trumbly-38.
Trumbly-38 and surrounding scaffolding in lean-to roof in courtyard outside boatbuilding shop
T-38 in courtyard, Bates boatbuilding shop.
T-38, rear shaft bearing and folding propeller.
Bates boatbuilding, keel of T-38.
T-38, cold-molded red-cedar decking just laid.